Cambridge, MA  JM Electrical Company, Inc. recently announced that it has completed project operations at Harvard Memorial Church, a historic development located at 1 Harvard Bus Tunnel in the center of Harvard Yard in Cambridge.

JM completed the HVAC control system for the upper and lower levels of the church and utilized wireless technology due to the complexities of the facility. All of the work was done while maintaining the architectural integrity of the building.

“We were happy to work on such a notable Harvard landmark,” said Adam Palmer, project manager at JM Electrical. “It was important with this job to ensure the preservation of the building and comfort of its visitors to enable year-round use, which is what the new control system will allow. Not only that, but the smart energy system will result in maximized energy efficiency and reduced energy costs for the church.”

Original Article High Profile Monthly